Week 10 Progress Report
Team 10 Members:
Shom Bhandari Nobuto Ishii
Brian Mckenna Tomo Yamada
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Testing and Optimizing
Calibrating PWM and thermal resistance
All fabrications and creating algorithm is complete
Software; implemented digital filter, PWM, flow contorl, DUT power supply limitor and overflow sensor
Accomplishments from Previous Week
Using voltage divider to read more than 10 voltage from DUT power supply by DAQ
PWM algorithm was finalized.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete the project !
Presentation at Delta Design
Poster and Report
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Setting up ADAQ system
Arbitrary value (creating button) on the screen
1. Copy to command window
2. Drag > (play button) to window
Disaster alarm
Thermal control mode → 0 - heater , 2 - DUT , (Rdh = 0 always)
Set DUT Temp: LL_SET_TSB_DAQ( ) → ATC_LL_SET_TSB_DAQ (ch.5, 0~2046) It will change DUT Temp
Set the max value to 125~130 degree Celsius
May use ATC_SET_Limits to avoid setting up the max values every time at initialization
Since DAQ cannot read more than 10 volt, it is necessary to use voltage divider to scale down the reading the voltage. Then we need to scale up the reading voltage in LabVIEW program in order to calculate actual power supply for DUT
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Digital filtering must occur for parameters going into theta calculation
PWM should be implemented into control system
Software-time PWM implemented, in leu of potentiometer-tuned on/off voltage (which was the previously developed method).
Coordinate with Jim Babcock what time presentation will be at Delta for week 10
Thursday 3/15/2012 at 10:30 set as an initial presentation time.
Demonstration of hardware in EBU-2 Room 131 to take place.
Tuesday 3/13/2012 at 1pm set as demo time.
Risks and Areas of Concern
Resources or Information Required but not Available
Schedule
3/12/2012~3/16/2012: Edit Report and Poster
3/15/2012 (Thursday) : Final presentation at Delta Design
Final presentation at Delta Design is scheduled at 1pm.
Poster session: 3/21/2012
Upcoming milestones
Week 10
→ Final meeting and final presentation
→ Testing and Optimizing
→ Completing the project
Updated Gantt chart
Budget (list amount spent and amount remaining)
Progress on Report
Peer Review grade suggestions:
Editing Report (30%) at 3/12/2012
Progress on Webpage
Adding additional files, pictures, video and documents
Editing pages