Overview of Status of Analysis, Design, Fabrication, Tests, etc.
After Testing on Monday (6/4) final distance between air bladders has been determined, however the weight of the model has become an issue. We have a minimum size requirement, and are unsure that cutting the base down to size will provide enough weight-loss
One solution is to try to minimize material wherever possible- thinning out the base and creating a groove on the underside
Alternate solution is to balance the total weight between both bladders because the scanner is open on both ends
The small assemblies have been mounted onto the base
Accomplishments from Previous Week
Fabrication of all parts is completed- final positioning to be determined
Successful test of a cherry tomato on Monday (6/4)
Goals for Next Week- Completed by Friday (6/8)
Order and obtain 4-40 nylon knurled head thumb screws (Calvin)
Obtain a small range gage (Kristen)
Finalize Solidworks drawings and have them checked by Tom/Isaiah (Calvin)
Finalize poster (Kristen)
Finalize analysis (Kristen & Alex)
Finalize annotated CAD/Solidworks pictures (Alex)
Finalize budget form (Alex)
Finalize project website (Femi)
Finalize final design report (All)
Complete the check off list (Kristen)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
The mouse head currently sits slightly too high so more material must be milled off the base (Hana, in person on (6/4)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Have poster, report and model finalized by friday, if further adjustments are made- notify by email of the changes
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Obtained comments about the final design report from Team 14 via notes on 6/4
Risks and Areas of Concern
The balance of the weight between the air bladders
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
$400 spent
Progress on Report and Webpage
Report, Poster and Webpage are being continuously updated