156B Week 9
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Analysis: Completed analysis about buoyancy, Solidworks analysis of buoy, analysis on power consumption
Design: Design completed for all hardware, plumbing, and wiring.
Test: Going to test prototype for buoyancy and strength as soon as fabrication of CPVC tube and Bulkhead are complete
Fabrication: CPVC tube 80% completed, Bulkhead 80% completed. Fabrication of Internal Housing StartedAccomplishments from Previous Week
Accomplishments from Previous Week
Fabrication of CVPC tube almost completed. Remaining: Chamfer at two ends
Fabrication of Bulkheads tube almost completed. Remaining: Hollow space in the middle of the bulkhead
Computer Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Contatced Computer Scientist for help in programming the IOIO board and Android phone
Buoyancy Analysis revised for new dimension of the tube.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete Bulkhead and CPVC tube fabrication and assembly (Austin, Mike)
Complete Internal Housing Fabrication (Mike, Austin)
Complete Programming (Gary, James)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Suggested personnel for help in Programming. The team contacted UCSD Computer Science students for assisting programming.
Risks and Areas of Concern
Programming
Budget (list amount spent and amount remaining)
$167.85 Left
Progress on Report and Webpage
Completed Second Draft. Reviewed Report of Team 12