Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Fabrication
Self-Reacting frame complete
Load Frame under fabrication
Motor mount initiated fabrication
Mount bearings to self-reacting frame
Design
Program control algorithm for fatigue tester
Design cycle counter
Testing
Test if bearing fits into four bearings
Test if tube can be spun in all four bearings
Accomplishments from Previous Week
Motor Drive
Wired and connected motor and motor controller and tested compatibility and functionality = it ran- Jerry, Brandon
Self reacting frame
Fabrication and assembly completed- Jorge, Sergio
Load Frame
Plan and measurements readied for fabrication
Test Article
One of the aluminum tubes as a test article is sanded and can fit the 4 bearings - Jerry
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete fabrication and assembly of load frame - Jorge, Sergio
Order remaining parts for bottom load plate from McMaster - Jerry
Complete fabrication of the motor mount - Team
Bearings
Bearings are mounted onto self-reacting frame - Jerry
Strain gauge is calibrated with strain conditioner - Jerry
Drill out pulley to match motor shaft diameter, create broach - Brandon
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Begin installing and testing strain gauge
Took load bolt to strain gauge expert- Jerry
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Look into cycle counting mechanism
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Bugs in programming of control system
Resources or Information Required but not Available
Schedule
Upcoming Milestones
Machining/Fabrication
Load Frame Completed
Bearings Mounted
Motor Mount machined, fabricated and attached to self-reacting frame
Electronics
DAQ arrives
Blueprint of control algorithm drawn up
Power on and power off
Update Gantt chart.
Budget (list amount spent and amount remaining)
Jerry's Purchases
5 3/8" Hole Aluminum Leveling Shims from McMaster-Carr - $7.99 (w/o tax and shipping)
Jorge's Purchases
1 38" Aluminum 1.5x1.5x0.25 Angle - $10
Progress on Report and Webpage
New images and new video will be uploaded sometime before the week ends