NIST 800-53 (r4) Control:
The organization:
(a) Develops a security assessment plan that describes the scope of the assessment including:
1. Security controls and control enhancements under assessment;
2. Assessment procedures to be used to determine security control effectiveness; and
3. Assessment environment, assessment team, and assessment roles and responsibilities;
(b) Assesses the security controls in the information system and its environment of operation [Assignment: organization-defined frequency] to determine the extent to which the controls are implemented correctly, operating as intended, and producing the desired outcome with respect to meeting established security requirements;
(c) Produces a security assessment report that documents the results of the assessment; and
(d) Provides the results of the security control assessment to [Assignment: organization-defined individuals or roles].
NIST 800-53 (r4) Supplemental Guidance:
Organizations assess security controls in organizational information systems and the environments in which those systems operate as part of: (i) initial and ongoing security authorizations; (ii) FISMA annual assessments; (iii) continuous monitoring; and (iv) system development life cycle activities. Security assessments: (i) ensure that information security is built into organizational information systems; (ii) identify weaknesses and deficiencies early in the development process; (iii) provide essential information needed to make risk-based decisions as part of security authorization processes; and (iv) ensure compliance to vulnerability mitigation procedures. Assessments are conducted on the implemented security controls from Appendix F (main catalog) and Appendix G (Program Management controls) as documented in System Security Plans and Information Security Program Plans. Organizations can use other types of assessment activities such as vulnerability scanning and system monitoring to maintain the security posture of information systems during the entire life cycle. Security assessment reports document assessment results in sufficient detail as deemed necessary by organizations, to determine the accuracy and completeness of the reports and whether the security controls are implemented correctly, operating as intended, and producing the desired outcome with respect to meeting security requirements. The FISMA requirement for assessing security controls at least annually does not require additional assessment activities to those activities already in place in organizational security authorization processes. Security assessment results are provided to the individuals or roles appropriate for the types of assessments being conducted. For example, assessments conducted in support of security authorization decisions are provided to authorizing officials or authorizing official designated representatives.
To satisfy annual assessment requirements, organizations can use assessment results from the following sources: (i) initial or ongoing information system authorizations; (ii) continuous monitoring; or (iii) system development life cycle activities. Organizations ensure that security assessment results are current, relevant to the determination of security control effectiveness, and obtained with the appropriate level of assessor independence. Existing security control assessment results can be reused to the extent that the results are still valid and can also be supplemented with additional assessments as needed. Subsequent to initial authorizations and in accordance with OMB policy, organizations assess security controls during continuous monitoring. Organizations establish the frequency for ongoing security control assessments in accordance with organizational continuous monitoring strategies. Information Assurance Vulnerability Alerts provide useful examples of vulnerability mitigation procedures. External audits (e.g., audits by external entities such as regulatory agencies) are outside the scope of this control. Related controls: CA-5, CA-6, CA-7, PM-9, RA-5, SA-11, SA-12, SI-4.
References: NIST Special Publication 800-40.
NIST 800-53 (r5) Discussion:
Organizations ensure that control assessors possess the required skills and technical expertise to develop effective assessment plans and to conduct assessments of system-specific, hybrid, common, and program management controls, as appropriate. The required skills include general knowledge of risk management concepts and approaches as well as comprehensive knowledge of and experience with the hardware, software, and firmware system components implemented. Organizations assess controls in systems and the environments in which those systems operate as part of initial and ongoing authorizations, continuous monitoring, FISMA annual assessments, system design and development, systems security engineering, privacy engineering, and the system development life cycle. Assessments help to ensure that organizations meet information security and privacy requirements, identify weaknesses and deficiencies in the system design and development process, provide essential information needed to make risk-based decisions as part of authorization processes, and comply with vulnerability mitigation procedures. Organizations conduct assessments on the implemented controls as documented in security and privacy plans. Assessments can also be conducted throughout the system development life cycle as part of systems engineering and systems security engineering processes. The design for controls can be assessed as RFPs are developed, responses assessed, and design reviews conducted. If a design to implement controls and subsequent implementation in accordance with the design are assessed during development, the final control testing can be a simple confirmation utilizing previously completed control assessment and aggregating the outcomes. Organizations may develop a single, consolidated security and privacy assessment plan for the system or maintain separate plans. A consolidated assessment plan clearly delineates the roles and responsibilities for control assessment. If multiple organizations participate in assessing a system, a coordinated approach can reduce redundancies and associated costs. Organizations can use other types of assessment activities, such as vulnerability scanning and system monitoring, to maintain the security and privacy posture of systems during the system life cycle. Assessment reports document assessment results in sufficient detail, as deemed necessary by organizations, to determine the accuracy and completeness of the reports and whether the controls are implemented correctly, operating as intended, and producing the desired outcome with respect to meeting requirements. Assessment results are provided to the individuals or roles appropriate for the types of assessments being conducted. For example, assessments conducted in support of authorization decisions are provided to authorizing officials, senior agency officials for privacy, senior agency information security officers, and authorizing official designated representatives. To satisfy annual assessment requirements, organizations can use assessment results from the following sources: initial or ongoing system authorizations, continuous monitoring, systems engineering processes, or system development life cycle activities. Organizations ensure that assessment results are current, relevant to the determination of control effectiveness, and obtained with the appropriate level of assessor independence. Existing control assessment results can be reused to the extent that the results are still valid and can also be supplemented with additional assessments as needed. After the initial authorizations, organizations assess controls during continuous monitoring. Organizations also establish the frequency for ongoing assessments in accordance with organizational continuous monitoring strategies. External audits, including audits by external entities such as regulatory agencies, are outside of the scope of CA-2.
38North Guidance:
Meets Minimum Requirement:
Evidence to show the results of the assessment are provided to organization management and other organization-defined personnel/entities.
If the CSP has conducted internal security assessments on the information system in scope, then they will need to meet all of the objectives in the above control to be compliant with CA-2.
Develop and document a Security Assessment Plan (SAP) that includes the purpose, scope (controls in scope of the assessment), testing methods and techniques, assessment schedule and POCs, etc.
Document the results of the security assessment within a Security Assessment Report (SAR) that includes the results of each control tested along with the compliance status of the overall information security system.
If the CSP has not gone through a FedRAMP assessment, but has gone through another assessment such as SOC, PCI, or ISO and they have an assessment plan to support either of those, this will suffice for the initial FedRAMP assessment.
Best Practice:
Determine if client/organization develops a security assessment plan that describes the scope of the assessment including:
security controls and control enhancements under assessment
assessment procedures to be used to determine security control effectiveness
assessment environment
assessment team
assessment roles and responsibilities
Client/Organization selects one or more of the following forms of specialized security assessment to be included as part of security control assessments:
in-depth monitoring;
vulnerability scanning;
malicious user testing;
insider threat assessment;
performance/load testing; and/or
other forms of organization-defined specialized security assessment
Unofficial FedRAMP Guidance:
None.
Assessment Evidence:
Annual Security Assessment Plan (SAP) for developed by an Independent Assessor or 3PAO.
Annual Security Assessment Report (SAR) for developed by an Independent Assessor or 3PAO.
Annual security assessments including announced vulnerability scanning performed by an independent third party for the current year, and previous year.
Communication showing where including the FedRAMP PMO were provided the SAP and SAR.
CSP Implementation Tips:
None.