- Frost load
- Mechanical attack
Comparison WPE DiaTec with standard concrete
Private sector
more ...
more ...
more ...
more ...
more ...
The binder and the aggregates are mixed dry for at least 3 minutes in the required mass ratio.
Water is necessary in drinking water quality to mix it to the binder material.
The minimum quantity of water is then added and the mixture is mixed for a further 5 - 8 minutes.
If after this time the desired consistency has not been adjusted, smaller amounts of water can be added. After additional water has been added, the mixture must be mixed for at least 3 - 4 minutes before adding water.
The installation time depends on the ambient temperature. On average, a installation time of 30 - 45 minutes is possible.