Search this site
Embedded Files
saklain.osu@gmail.com
  • Home
  • N2 MBE Rajan Group
  • Cleaning and Bonding
  • Turning ON the System
    • Before starting:
    • Check Pump Status:
    • Start Phase Separator:
    • Load your sample:
    • Turn ON Liquid Nitrogen valve:
    • Start heating:
  • Start the Growth
    • Change software index
    • Start RHEED
    • Ga Sr Cell PID:
    • Make sure
    • Close Ion pump
    • Start Nitrogen Flow:
    • Start Turbo Pump
    • Plasma Pre-check
    • Start N₂ Plasma
    • Adjust N₂ Flow
    • Start growth
  • Turning Off the System
    • Turn OFF Plasma:
    • Shut Valve 2 (N₂ cylinder):
    • Cool down cells:
    • Ga Sr Cell PID: v
    • Close Veeco N₂ valve
    • Switch Pump Status:
    • Turn OFF RHEED:
    • When all cells < 800°C:
    • Turn OFF phase separator (if no other samples)
  • Loading the Sample [LoadLock]
saklain.osu@gmail.com
  • Home
  • N2 MBE Rajan Group
  • Cleaning and Bonding
  • Turning ON the System
    • Before starting:
    • Check Pump Status:
    • Start Phase Separator:
    • Load your sample:
    • Turn ON Liquid Nitrogen valve:
    • Start heating:
  • Start the Growth
    • Change software index
    • Start RHEED
    • Ga Sr Cell PID:
    • Make sure
    • Close Ion pump
    • Start Nitrogen Flow:
    • Start Turbo Pump
    • Plasma Pre-check
    • Start N₂ Plasma
    • Adjust N₂ Flow
    • Start growth
  • Turning Off the System
    • Turn OFF Plasma:
    • Shut Valve 2 (N₂ cylinder):
    • Cool down cells:
    • Ga Sr Cell PID: v
    • Close Veeco N₂ valve
    • Switch Pump Status:
    • Turn OFF RHEED:
    • When all cells < 800°C:
    • Turn OFF phase separator (if no other samples)
  • Loading the Sample [LoadLock]
  • More
    • Home
    • N2 MBE Rajan Group
    • Cleaning and Bonding
    • Turning ON the System
      • Before starting:
      • Check Pump Status:
      • Start Phase Separator:
      • Load your sample:
      • Turn ON Liquid Nitrogen valve:
      • Start heating:
    • Start the Growth
      • Change software index
      • Start RHEED
      • Ga Sr Cell PID:
      • Make sure
      • Close Ion pump
      • Start Nitrogen Flow:
      • Start Turbo Pump
      • Plasma Pre-check
      • Start N₂ Plasma
      • Adjust N₂ Flow
      • Start growth
    • Turning Off the System
      • Turn OFF Plasma:
      • Shut Valve 2 (N₂ cylinder):
      • Cool down cells:
      • Ga Sr Cell PID: v
      • Close Veeco N₂ valve
      • Switch Pump Status:
      • Turn OFF RHEED:
      • When all cells < 800°C:
      • Turn OFF phase separator (if no other samples)
    • Loading the Sample [LoadLock]

Nitride MBE

Rajan Group

Google Sites
Report abuse
Page details
Page updated
Google Sites
Report abuse