Solved ventilation and air circulation issues on sewing floor.
Solved bottleneck in sewing line and utilized manpower.
Proposed an efficient layout for washing and dyeing section.
Analyzed sewing defects by fish bone diagram and proposed solution.
Daylong industrial visit.
Introduced with the working mechanism of spinning, knitting, dyeing, washing and sewing operations.