The Implant levee constructed by the GIKEN G.R.B System as a noise & vibration-free piling method was adopted, keeping the function of both the existing levees and arterial roads. Since 2012, approximately 10 Press-in machines have been piling 8,500 Steel tubular piles (1,000 dia. & 10.0-24.5m length) and 3,820 steel sheet piles (U shaped & 15.0-23.0m length) in the 19.0 km linear meter area along the coast.