Overall Design Process List:
Two of our team members had covid-19
Monday Ann met with the team via zoom and discussed doing the research, the research paper and the website
The rest of the team worked on the in person assignments
First the bridge design was split up
Shaan and Nathan worked on the bridge designer and built a bridge with the lowest cost while meeting the requirements given.
Nathan made a sketch of the bridge
Nathan and Farrah worked on ModelSmart3d and built our bridge design
Farrah did the bridge kit, TinkerCAD, and the finalized and edited the ModelSmart 3D bridge.
Nathan, Shaan, and Farrah teamed up with group 7 to build the bridge as Covid-19 KO'ed 2 of our group members.
Shaan and Nathan built the base of the bridge which took a whole afternoon
Farrah helped build the bridge's arch and supports.
Ann worked on adding images, captions and information to the website
Shaan, Nathan and Farrah finished assembling the bridge
Nathan worked on the Summary and Project Evaluation
Shaan and Farrah adding finishing comments to the website.
Farrah wrote the reflection on the website
Shaan, Nathan, Farrah, and Annposted the end-user and technical questions.
Shaan, Nathan, Ann and Farrah recorded a zoom responding to technical and end-user questions posted.