There are many people searching for free dumps for C9010-260 exam, now we will share IBM IBM Certified Sales Specialist C9010-260 exam free questions and answers here for you to practice, you also can contact us to get more free questions. And if we update, we will share update version to you.
New feedback: Just passed C9010-260 IBM Power Systems with POWER8 Sales Skills V2 on May.31.2018. number of test questions: 214 Q&As
1.A potential IBM POWER8 customer is worried about the life of RISC processor.
Which of the following response should help the customers do not have to worry too much about
investment in Power System's?
A. Because IBM support Little Endian, AIX and IBM i will be able to run on x86.
B. IBM operating system and Power Technology Roadmap emphasizes the IBM technology promises.
C. Even if POWER stop production, all IBM applications and middleware have been ported to Linux.
D. IBM assure OpenPOWER foundation that IBM will continue to develop POWER chips in the next 10
years.
Answer: B
2.A customer is close to maximum energy consumption in their data center and wants to measure and
predict energy use.
Which POWER8 feature will provide the required function?
A. Power capping
B. Power saver mode
C. Power core nap mode
D. Power trending
Answer: D
3.Software developers can take advantage of what elements of POWER8 technology to optimize the
performance in E870?
A. transactional memory and SMT
B. Active Memory Expansion and store keys
C. first failure data capture (FFDC) and the service processor
D. Hypervisor and thermal power management device (TPMD)
Answer: A
4.Customers want to run an Oracle application which POWER8 and competitors platform both provide.
The Oracle application per core permission.
Which POWER8 processor advantage can provide a competitive advantage of total cost of ownership
(TCO) aspect?
A. core performance
B. 8 cores per processor
C. 3 memory cache
D. processor instruction retry
Answer: A
5.How does POWER8 technology bring to lower TCO?
A. higher performance core can reduce software license.
B. RAS feature means that no longer need to spend any cost on a failover system.
C. Power systems of lower energy consumption can be reduce 20% of the system cost.
D. Software License and Capacity on Demand make the minimum number of software license core.
Answer: A
6.Which P0WER8 technology features contribute the most to lower TCO?
A.CAPI and transactional memory
B.High performance cores and SMT
C.PCIe Gen3 support and Hot Plug adapters
D.First Failure Data Capture and Thermal Power Management Device
Answer: B
7.A customer is running a large application on x86 Linux with an Oracle Enterprise database.
Which of the following can be used to financially justify migrating the application to POWER8 and DB2?
A. POWER8 requires fewer cores to run the same workload.
B. POWER8 Active Memory Expansion reduces the cost of memory.
C. POWER8 cores exploit SMT6.
D. POWER8 hardware and software maintenance costs are lower.
Answer: A
8.What PCI adapter does POWER8 support?
A. only PCIe Gen 3
B. PCI-X and PCIe Gen 3
C. PCIe Gen 1, PCIe Gen 2 and PCIe Gen 3
D. PCI-X, PCIe Gen 1, PCIe Gen 2 and PCIe Gen 3
Answer: C
9.Which of the following features does POWER8 scale-out system provide?
A. memory capacity on demand expansion
B. processor capacity on demand expansion
C. redundant service processor
D. solid state disk drives
Answer: D
10.A POWERS customer with disk expansion drawers needs a non-disruptive solution to improve the disk
performance at the lowest cost.
What should be proposed to satisfy the customer's requirement?
A. V7000 SAN Disk
B. 840 Flash Storage
C. DS5000 SAN Disk
D. SSD drives
Answer: D
11.A customer has a 6TB database that needs a very high performance solution at the lowest cost.
Which system is the more cost effective solution?
A. The S824 with attached FlashSystem 840.
B. The S824 with integrated SSDs and V5000.
C. An E870 with internal disk drives and SSDs.
D. The S824 with internal disk dnves and SSDs with Easy Tier.
Answer: B
12.Faced with an commercial opportunity of multiple competitors, what resources should be used to
create sales materials?
A. FindIt
B. ibm.com
C. InfoCenter
D. Knowledge Center
Answer: A
13.Which tool can be used to determine the three-year TCO of a an S824 system compared to an HP
DL580?
A. Power Systems Speed Sheets
B. TCO Cost Estimator
C. Quick Pricer
D. Alinean TCO tool
Answer: D
14.Which P0WER8 RAS feature is available on all Scale-out and Enterprise systems?
A. Dual System Clocks
B. Hot Plug PCIe adapters
C. CoD cores
D. DualFSPs
Answer: B
15.Which of the following RAS features on both the scale-out system and enterprise system are
provided?
A. CAPI
B. redundancy FSPs
C. CoD memory and core
D. redundant power supply
Answer: D
16.PowerVM Enterprise Edition provides which availability function?
A. High availability failover
B. Live Application Mobility incase of a system failure
C. Policy based workload relocation
D. Live Partition Mobility
Answer: D
17.Which of the RAS features only on Power Enterprise Systems provide?
A. ECC memory
B. Chipkill memory
C. FFDC (First Failure Data Capture)
D.Double FSPs (Flexible Service Processor)
Answer: D
18.According to the new regulations, a Power Systems customer must be at a primary site with a
minimum of 120 miles (194 kilometers) away from the place to set up a disaster recovery site .
What the minimum of PowerHA solution should be suggested?
A. Express Edition
B. Standard Edition
C. Enterprise Edition
D. Geographic Edition
Answer: C
19.A client running Oracle databases is considering a Power solution. They want the highest level of
reliability, performance, and support.
Which operating system on Power should be recommended?
A. Red Hat
B. IBMi
C. AIX
D. SUSE
Answer: C
20.Customers have no internal IT support staff; they need to implement a whole solution including
relational databases, industry-leading security solution, based on standard internet technology, home
network and storage management capabilities.
Which operating system is able to meet customer requirements?
A. AIX
B. IBM i
C. LINUX
D. Windows
Answer: B
21.Customers want to replace their existing x86 server cluster, the cluster is currently running Domino,
Websphere application server, file services, print services, Cognos and DB2 databases.
Which operating system can provide an integrated solution to meet customer requirements?
A. Red Hat
B. SUSE
C. IBM i
D. AIX
Answer: C
22.A customer is concerned about Power Systems security in a virtualized environment. They want real
time monitoring and a trusted firewall between LPARs.
Which IBM product should be proposed?
A. PowerVM
B. PowerSC
C. Tivoli Security Policy Manager
D. IBM Security Access Manager for Enterprise Single Sign-On
Answer: B
23.What is the PVU value of IBM dual socket lateral scale-out system?
A. 50 PVUs per processor
B. 70 PVUs per core
C. 100 PVUs per scoket
D. 120 PVUs per system
Answer: B
24.When customers run Linux and VMware on x86 systems, they want to add a S822L into a unified
virtual environment.
How Power options can meet the requirements?
A. Implement appropriate KVM base version on Power and x86 systems.
B. Implement Kimchi as a management interface to support the both environments.
C. Convert VMware into PowerVM on x86 systems to ensure the consistency of Power Systems.
D. Implement PowerVM and VMware, because both their function and management interface are shared.
Answer: A
25.Which of the following POWER8 server and NEBS (Network Equipment Building System) are
compatible?
A. S814 and S822
B. S824L and S824
C. S822L and S822
D. S822L and S812L
Answer: C
26.An application has a high availability requirement and is implemented with two local partitioned
POWER8 servers and one remote partitioned POWER8 server. One local server runs production and
replicates data to the backup local server. The backup local server replicates data to backup remote
server.
What is the minimum number of HMCs required to support the sites?
A. 4
B. 2
C. 3
D. 1
Answer: B
27.A customer needs to support an HPC cluster, and needs the maximum number of cores in a standard
19 inch rack. The customer can run either AIX or Linux.
Which POWER8 server best satisfies the requirement?
A. S824
B. S822
C. S822L
D. S824L
Answer: A
28.What is a limitation of the 4-core S814 model once installed? Inability to change the:
A. change rack to tower
B. operating system from AIX to Linux.
C. disk controller from non-cache to cache
D. attached tape drive from LTO-5 to LTO-6.
Answer: A
29.Customers need a 4-core S814 server, which requires 1TB available disk space run the ERP
applications. Customers hope to achieve the lowest TCA, at the same time to minimize rack space.
Which disk storage technology meet these requirements?
A. SAN
B. Flash
C. Internal hard disk
D. Internal solid-state disk
Answer: A
30.A customer with an AS/400 running S/36 code needs to migrate to a new P0WER8 system. They
require a deskside solution.
Which solution will satisfy the customer's requirements?
A. S812L running IBM i 6.2
B. S814 running IBM i 7.1
C. S822 running IBM i 7.2
D. S814 running IBM i 6.1
Answer: B