Milestones and Deliverables

Fall 2021 Milestones:

Milestones and Deliverables Time Sheet: (September 10,2021)

A list of milestones and deliverables as well as team member responsibilities

Research on Elizabethtown: (September 24,2021)

Description of watershed, current BMPs in place, and contains contour data for the watershed

Current BMPs in Buffalo Lake Watershed: (October 8, 2021)

Design plans for the current BMPs in the Buffalo Lake watershed

Precipitation and Watershed Delineation: (October 15, 2021)

A watershed delineation for the Buffalo Lake watershed that shows how runoff flows as well as precipitation data

Soil Mapping: (November 5, 2021)

Soil map of expected area used for BMP design

AutoCAD Sand Basin Design: (November 12, 2021)

Preliminary design drawing of Sand Basin

Potential BMP Effectiveness: (November 19, 2021)

Analysis of standards and topography from North Carolina and Tennessee BMP projects

Spring Semester Goals:

Outlines questions obtained during poster presentation and goals for spring semester


Spring 2022 Milestones:

Final Plant List and Pest Concerns: (January 28, 2022)

Provides plant list to be used around basin as well as benefits on limiting pests based on chosen plants

Nitrogen and Phosphorous Modeling: (Feb 3, 2022)

Shows GIS modeling of nitrogen and phosphorous in and around watershed

Maintenance Plan: (February 18, 2022)

Describes needed maintenance for sand filter basin, vegetated area, the forebay, and the riprap overflow area

Emergency Spillway: Vegetated Area (March 4, 2022)

Describes the need for a spillway surrounding basin

Sand Filter Basin and Forebay Calculations: (March 11, 2022)

Shows the calculations used to properly size the forebay and the depths of the filter materials.

CAD Drawings: (April 15, 2022)

Future Recommendations: (April 22, 2022)

Gives future recommendations on how to improve the project in the future and other possibilities.