Milestones and Deliverables
Fall 2021 Milestones:
Milestones and Deliverables Time Sheet: (September 10,2021)
A list of milestones and deliverables as well as team member responsibilities
Research on Elizabethtown: (September 24,2021)
Description of watershed, current BMPs in place, and contains contour data for the watershed
Current BMPs in Buffalo Lake Watershed: (October 8, 2021)
Design plans for the current BMPs in the Buffalo Lake watershed
Precipitation and Watershed Delineation: (October 15, 2021)
A watershed delineation for the Buffalo Lake watershed that shows how runoff flows as well as precipitation data
Soil Mapping: (November 5, 2021)
Soil map of expected area used for BMP design
AutoCAD Sand Basin Design: (November 12, 2021)
Preliminary design drawing of Sand Basin
Potential BMP Effectiveness: (November 19, 2021)
Analysis of standards and topography from North Carolina and Tennessee BMP projects
Outlines questions obtained during poster presentation and goals for spring semester
Spring 2022 Milestones:
Final Plant List and Pest Concerns: (January 28, 2022)
Provides plant list to be used around basin as well as benefits on limiting pests based on chosen plants
Nitrogen and Phosphorous Modeling: (Feb 3, 2022)
Shows GIS modeling of nitrogen and phosphorous in and around watershed
Maintenance Plan: (February 18, 2022)
Describes needed maintenance for sand filter basin, vegetated area, the forebay, and the riprap overflow area
Emergency Spillway: Vegetated Area (March 4, 2022)
Describes the need for a spillway surrounding basin
Sand Filter Basin and Forebay Calculations: (March 11, 2022)
Shows the calculations used to properly size the forebay and the depths of the filter materials.
CAD Drawings: (April 15, 2022)
Future Recommendations: (April 22, 2022)
Gives future recommendations on how to improve the project in the future and other possibilities.