Search this site
Embedded Files
Skip to main content
Skip to navigation
CPE/EE 423-424
Home
Projects
Roadmap
Expenses
Rubric
Sections
ECE Projects
Interdisciplinary Projects
Opportunities
Safety
Resources
Standards
CPE/EE 423-424
Home
Projects
Roadmap
Expenses
Rubric
Sections
ECE Projects
Interdisciplinary Projects
Opportunities
Safety
Resources
Standards
More
Home
Projects
Roadmap
Expenses
Rubric
Sections
ECE Projects
Interdisciplinary Projects
Opportunities
Safety
Resources
Standards
Rubric
Civil Engineering Interdisciplinary Senior Design Project
Oral Presentation
Mission Statement – Introduction to the project
Identify of the project scope and client’s needs
Clearly convey the engineering principles being applied
Identification of all codes and standards
Describe how the codes and standards impact the proposed design
Technical design – detailed development of the selected design alternatives using drawings, tables, and graphs (not excessive words)
Proposed design is supported with sound engineering principles, clear methodologies, and results
UN
Sustainable Development Goal(s)
are being considered and supported within the design
ASCE
Envision Rating System
– design considers public health, safety, environmental, and economic factors – Determine Envision Award Level
The design includes an innovative solution if possible
Project schedule for the semester
Organization, quality, and clarity of presentation
Ability to communicate effectively as a team
Written Report
The design team has phrased the problem statement clearly and understands the problem
The design was developed using appropriate engineering methods and tools
The designs presented are accurate and supporting calculations are provided
The report includes appropriate drawings, sketches, and details that support the proposed designs
All design codes and standards have been addressed properly
UN
Sustainable Development Goals
are identified and supported within the design
Appropriate environmental considerations have been addressed using the
Envision Rating System
A rough cost estimate has been developed
Project plan/schedule for the semester was realized
The report is well organized and well written
Google Sites
Report abuse
Google Sites
Report abuse