Milestones


Image free for commercial and noncommercial use

Fall 2020 Milestones

The Fall 2020 Milestones focus on researching the problem, determining a design solution, and completing preliminary design calculations.

Fall Project Timeline (September 4, 2020)

Includes project Gannt chart and a list of milestones, deliverables, and team member responsibilities.

Dog Park Impact (September 11, 2020)

Includes report on initial research on the impact of dog parks on water quality.

Soil Analysis (September 18, 2020)

Includes findings from Web Soil Survey on the types of soil at the dog park as well as soil characteristics.

Precipitation Analysis (September 25, 2020)

Includes findings on the quantity of runoff present at the park.

Contaminants Research (October 2, 2020)

Includes information on the quantity of contaminants produced by the dog park as well as water quality regulations.

Includes information on the effectiveness of possible methods for containing pollutants of concern.

Containment System Decision (October 30, 2020)

Includes decision matrix comparing the top three methods considered for the design.

Surveying Data (November 20, 2020)

Includes surveying data collected to find land slopes needed in weep berm calculations.

Design Location (November 20, 2020)

Includes map of the location of the system.

Spring 2021 Milestones

The Spring 2021 Milestones focus on completing engineering calculations, creating drawings and diagrams, and determining project cost.

Includes project Gannt chart and a list of milestones, deliverables, and team member responsibilities.

Includes description, materials, and dimensions of french drainage system and weep berm pipes.

Includes diagram showing type and placement of plants in riparian buffer.

Includes cost estimate of planting from various vendors.

Includes cut and fill diagram and volumes.

Includes aerial and cross-sectional drawings of design.

Includes final cost estimate for project using LFCUG Parks and Recreation bidding sheet.