Date: 03/15/2021
8:05 AM: Worker is welding together the roof trusses and the columns, that were placed last week, on the west wing of the Academic classroom and Laboratory Complex (ACLC).
8:57 AM: Columns are being welded together to the roof trusses by workers on the east and west wing of the ACLC.
10:59 AM: Workers are working on the truss structure at the roof of the east wing of the ACLC. Workers are working at three different locations simultaneously (Shown in the red circle)
11:41 AM: Steel bars are placed on an incline on the east wing of the ACLC. The steel bars are welded to the beam and column structures that are underneath the steel bar. The roof panels will be later placed on top of these steel bars.
3:18 PM: The steel bars are still being placed on the east wing of the ACLC around mid-afternoon with the use of a crane (Circled in red).