Date: 02/01/2021
06:35 AM -
Workers can be seen mobilizing and preparing ahead for the day's work.
07:05 AM-
Workers are seen setting up formwork (highlighted by the red ellipse) over the columns of the back entrance.
Before
After
9:39 AM-
The formwork over the entrance columns had been placed around 9 AM. The workers then mobilized on the east wing of the site and as shown in the picture a crane was used to transport and afix red rectangle falsework.
16:30 PM-
The falsework were installed throughout the entire area shown in the ellipse. Around 16:30 PM workers started gathering their tools and closed the site for the day of 02/01/2020