Date: 03/08/2021
10:40 AM: Workers are inspecting the truss systems before placing the roof panels later on in the day. The truss system being inspected is on the top floor of the west wing of the Academic Classroom and Laboratory complex (ACLC).
10:43 AM: A crane is used to transport columns to the west wing of the ACLC.
1:40 PM: Formwork is removed from cast structures and piled onto each other. The pile of formwork is removed from the east wing of the ACLC by the workers using a crane.
2:25 PM: A worker is cleaning the construction site. Cement and sand is picked using a shovel and seperated.
3:01 PM: After the successful inspection of the truss system on the roof of the west wing of the ACLC at 10:40 AM workers are seen installing the roof panels on top of the truss system.