This is our second bridge, and out of the two it was the most challenging. As while getting the first bridge to work was took lots of trial and error, building this bridge was a whole different experience. As the first program that we used was simple and very intuitive, while the second program was complex, primitive and confusing. As while it seemed powerful, it was also very limit in its abilities and in the easy of use, as during our experimentation it glitched and did unintended things that even TA's had trouble with. In the end however we got it to work and built the a bridge that completed all the requirements, in dimensions, physical requirements and the maximum load capacity test. We also tried to add a synthetic load by setting a default load and set find breaking force, but after working for a long time and trying to get the program to work we could not figure out what was wrong, as while it successfully passed when not setting anything, even one pound the bridge broke, even though it should not have.