This bridge was very difficult to build given the requirements, as with the maximum stress and strain permitted per tube, along with restricted materials and other specifications we lost many a truck. Nevertheless, in the end after each and everyone of us worked on our own designs to try to solve the problem, we finally settled on one design that fit all the specifications perfectly. This design as one can see, has become the icon for this week.