Phase 1: Refurbishing the Go-Kart
Rust Removal
Figure 1. Using sanders to remove the surface rust of the go-kart
Edge Cutting
Figure 2. Using the angle grinder to cut extra parts in the go-kart.
Phase 2: Drive-By-Wire Implementation Design Process
Motor Mount Design
Figure 3. CAD drawing of the motor mount design. (Refer figures in Multimedia for 3D view)
Motor Mount Installation
Figure 4. Design in application
Phase 3: Steer-By-Wire Implementation
Video 1. Video of the drive-by-steer model testing.
Figure 6. Steer-by-wire implementation in the go-kart( Isometric view)
Video 2. Video of the drive-by-steer testing.
Phase 4: Final Design
Figure 7. Final Design
Video 3. Go-kart performance