Stillman Elementary

Aerial-view drawing of a proposed addition at Stillman Elementary School.

Stillman Site Plan

Small addition extending toward Windsor and Tenafly roads

Concept drawing of Stillman Elementary School with a small addition extending toward the intersection of Windsor and Tenafly roads among the proposed improvements.

Stillman Concept Drawing

One-story addition for greater flexibility for small-group instruction

Some windows no longer function properly, cost money in lost energy, and are risks for water leaks.

Window Replacements

Improve energy efficiency, which reduces annual costs

At our elementary schools, individualized instruction often takes place in converted spaces to serve as a teaching environment.

Improved Instructional Spaces

Windowless storage room converted to small-group space

A child rides on a flat scooter in a school hallway during a physical therapy session.

Improved Instructional Spaces

Physical therapy services often happen in hallways and other less-than-ideal areas

At our elementary schools, individualized instruction often takes place in converted spaces to serve as a teaching environment like the middle of a hallway.

Improved Instructional Spaces

Adequate space for small-group services like Basic Skills, Resource Room, occupational and physical therapies

School entrance without a physical barrier to the main building. Two-stage security vestibules are proposed for every school.

Safety Updates

Two-stage entrances, protective bollards, shatter-resistant window film and improved exterior doors

See other projects planned for Stillman Elementary