on the first day we began the assembly of the swingarm we had to attach the break line along with the breaks continuing onto the second day of working on the car we installed the swing arm onto the rear of the car.
assembly of the swing arm
40" ridged brake line
rear fender bracket
installation of the swing arm
400 lbs suspension
for the past three days before the swingarm was installed we worked on a relay lab kit to help us understand more of the electrical side of the car and to provide a simulation of a working dash board on a car.
day three of working on the vehicle we installed the motor onto the frame along with installing the sprockets to be able to attach the roller chain the next day and to finish attaching the motor on day four we finished attaching the motor and installed the chain onto the motor and on day five we finished the motor installation by attaching the chainguard.
motor attachment
motor sprocket attachment
rear sprocket attachment
final adjustments on the motor
master link detachment
master chain link
complete installment of the chain
chainguard fitting
installing bolts for the chainguard
complete chainguard installment