The road connection between different points of geography is essential to ensure collective progress and territorial balance, putting the service of people and companies spaces for exchange and relationship.
For it is necessary exactly calibrate the scope of these requirements, current and future, from an integral perspective of land management.
Vallcarca access to the C-31
CONSTRUCTION PROJECT.
Improving access to the port of Vallcarca in the C-31. PK 168 + 700
The objective of the project is the transformation to an intersection channeled to central lanes, left turns and acceleration and deceleration. In addition to adapting the firm to normal traffic.
GISA
Freginals-Amposta Road
MODIFIED PROJECT.
New road between the TV-3317 and the T-344
KP 0 + 000 to 4 + 950
KP: Section Freginals-Amposta.
Objective of the project:
Include all unit prices offered by the successful tenderer for the execution of the works, more the new prices that appeared.
Collect and justify in detail all modifications required for the proper execution of the works.
Main changes:
Change of the gradient reducing the slope from 8% to 6%.
Change in cross drainage works to be built with precast concrete.
Placing a double twisted steel to prevent landslides
Environmental recovery of the area by transplanting native species.