The interaction between human beings and the natural environment is not incompatible with respect. Economic development and social progress can be reached without threatening the balance of the natural ecosystem. We know it is possible and necessary act that way and we took out in 1998 TCE was the pioneers to participate in the
creation of the first legalized private dumping site in Catalonia.
The compromise for the environmental protection during the process of drafting and construction management is an essential element of our company policy.
Therefore, our management systems allow us to unify objectives, simplifying and reducing resources and, consequently, improve efficiency and service to customers.
With a comprehensive view of the proceedings, analyzing their impact in relation to the environment and in relation to a common heritage of great value, that identifies
and distinguishes us, and that we must preserve.
Related to Water
Manuel A. Soler Manuel
Operations Director ATLL
(6 years) Metropolitan Area of Barcelona.
Collection, treatment and distribution of drinking water high. Barcelona area to 4.5 million people. Exploitation rates, improved treatments, management of primary network up deposits. Control water quality in rivers.
Domingo Monserrat Pitarch
Estrecha colaboración con la empresa ATLL durante diez años.
Closely with the company for ten years ATLL.
Extensive experience in projects of water purification systems, as well as strategic planning and resource optimization, drives, irrigation, etc.
ALFA TECNOLOGIES
Atellier Barcelona Group (View Water Presentation)
-Client: Aigües del Segarra Garrigues.
-Province: Lleida.
-Budget: 14.455.960,71€.
-Execution time: 17 months.
Over the past few decades numerous studies have been done to fulfill the old
farmer's aspiration of using the Segre River to irrigate zones of l'Urgell, la Segarra and Les Garrigues. These studies finally favored a project to convert 70.000 hectars of dry farming into irrigation farming. This will be possible through the connection of Rialb damning, near Segre's outlet, with the Segarra-Garrigues irrigation channel.
Other Clients:
-Client: Aigües Ter Llobregat.
-Province: Barcelona.
-Budget: 23.125.289,25€.
-Execution time: 16 months.
-Client: Agència Catalana de l'Aigua.
-Province: Barcelona.
-Budget: 14.633.869€.
-Execution time: 16 months.
-Client: COPISA Industrial.
-Country: Marocco.
-Budget: 9.673.555,85€.
-Execution time: 16,5 months.
-Client: CLABSA Industrial.
-Province: Barcelona.
-Budget: 1.094.200,00€.
-Execution time: 9 months.
Purification System Manlleu
CONSTRUCTIO PROJECT.
Construction project for the expansion of the purification system of Manlleu.
The objective of the project:
Carry out works and necessary to make it possible the purification of water to be treated to the limits set by the legislation, with nutrient removal, since the design of the existing plant does not allow facilities.
It wants to double the WWTP of Manlleu in the following units: biological reactor, settler and gravity thickener. The viability of the need to expand will also be studied in other units to enable the proper functioning of the enlarged plant.
It tries to avoid the major problems that are taking recorded in the plant, such as solids outlet with inputs secondary clarifier when the flow in the biological exceeds 500 m³ / h troubleshoot sucking secondary clarifier when the flow recirculation is adjusted to the order of 380 m³ / h, and others that are described in Annex No 3 of the current situation in the WWTP.
ACUAMED
Dumping Site Romaní
CONSTRUCTION PROJECT &
PROJECT MANAGEMENT
Closing and conditioning of industrial waste deposit.
The objective of the project:
Closing the private dumping site owned by a company and condition environment.
Build a leachate pond by pipeline to collect the waste produced by the reservoir closed.
Particular customer