Footbridge Botafoc
PROJECT MANAGEMENT.
Footbridge connecting "M" Street Street Botafoc with Roquetes Street.
Supervision and control of construction of footbridge over the torrent Culleré. El Vendrell, Tarragona. (Spain)
This project creates a connection, meeting current recommendations concerning studies local flooding.
Vendrell City Council.
Lift waters of the Ebro River
PROJECT MANAGEMENT.
LIFT waters of the Ebro.
The objective of this work is to perform the necessary to supply water municipalities Archbishop Albalate, Alcorisa, Alloza, Ariño Andorra and performances.
Hydraulic installations:
Water connection at the tail of the dam of Mequinenza associated with a pumping station.
Four ponds
Samper pond with pumping stations.
Val de Arcos with with pumping station.
Albalate pond for distribution.
Piogordo pond for distribution.
Impulsion. Three main sections:
Section 1. Take-pond River Ebro of Samper.
Section 2. Pumping Station Samper - Pond of Val de Arcos
Section 3. Pumping Station Val de Arcos - Pond Piogordo Station.
Main Features:
Periodic quality control.
Certification of the work performed.
Budget control.
COMMONWEALTH TURULENSE
Port of Barcelona
PROJECT MANAGEMENT AND DOCUMENT MANAGEMENT.
The work was done through a joint venture formed by:
TCC
ALATEC
PROINTEC
Main features:
Periodic quality control.
Certification of the work done.
Budget control.
Document management of all the works of the port.
PORT OF BARCELONA