NEW BUS SERVICE TO BE PROVIDED ON COMPLETION OF THE 200TH DWELLING. UNTIL THEN, AREA WILL BE COVERED BY ROUTES 38 AND 39, A 3HA PARK AND RIDE SITE. £2M
HEALTH CARE SERVICES 3 GP HEALTH CENTRE NEEDED TO SERVICE 2000 DWELLINGS. £2.325M
LEISURE AND COMMUNITY SERVICES TO BE PROVIDED IN TWO LOCAL CENTRES, TOTALLING ONE HECTARE OVERALL AND COMMUNITY FACILITIES INCLUDING A NEW LIBRARY. £1.59M
TWO 420 PLACE PRIMARY SCHOOLS. £13M
Moulton Bypass Paid for, phase 1 work already started.
also see
Overstone Leys development road map
Primary
2,000 DWELLINGS;
7HA OF EMPLOYMENT LAND IN THE FORM OF A TECHNOLOGY REALM INCORPORATING A GATEWAY FEATURE;
AT LEAST ONE LOCAL CENTRE TO INCLUDE LOCAL RETAIL FACILITIES (INCLUDING A CONVENIENCE STORE NOT EXCEEDING 1,200 SQM TRADING FLOORSPACE)
A CONTRIBUTION TOWARDS THE PROVISION OF A HIGH QUALITY PUBLIC TRANSPORT CORRIDOR TO NORTHAMPTON TOWN CENTRE;
A43 CORRIDOR MITIGATION MEASURES AND PROVISION OF REQUIRED HIGHWAY INFRASTRUCTURE INCLUDING IMPROVEMENTS TO ROUND SPINNEY ROUNDABOUT £11M;
AN INTEGRATED TRANSPORT NETWORK FOCUSED ON SUSTAINABLE TRANSPORT MODES, INCLUDING PUBLIC TRANPORT, WALKING AND CYCLING WITH STRONG LINKS TO ADJOINING NEIGHBOURHOODS, EMPLOYMENT AREAS AND THE TOWN CENTRE;
STRUCTURAL GREENSPACE AND WILDLIFE CORRIDORS (INCORPORATING COWPASTURE SPINNEY AND COLEMAN LEYS)
WASTEWATER INFRASTRUCTURE - NEW SEWER CONNECTING SUE TO EXISTING NETWORK £1.48M
SECONDARY