Minutes - 2011-09-24
CCC September Meeting
September 24th, 2011 at 7:00pm at Dalhousie Community Centre
Present: John Verbaas – Chairperson, Action Sandy Hill; Leslie Kirk – Vice-chair, Old Ottawa East Community Association; Jordan Charbonneau – Centretown Citizens Community Association; Roland Dorsay, Island Park Community Association Ida Henderson, Dalhousie Community Association; and George Wright, Glebe resident.
1. Administrative
a. Agenda Approved with addition of 2 pieces of other business
b. Leslie volunteered to be meeting secretary
c. June 29th 2011 minutes approved
2. Election of Chair, Vice-chair, Secretary for 2011-2012
a. John – selected as Chair
b. Jordan – vice-chair
c. Leslie – Secretary
3. Alta Vista Transportation Corridor
- Restart of initiative to remove Phases 2 and 3 from the next Transportation Master Plan (TMP)
- Pierre Sadik (David Chernushenko’s office) to arrange a meeting in near future
- John to attend representing Action Sandy Hill
- Jordan and Leslie to represent CCC
4. Pedestrian Bridge Updates (John)
a. Rideau River Crossing at Strathcona park: report from second public open house to be available soon
b. Canal Crossing at 5th Avenue/Clegg Street: second open house to be held sometime this fall
5. Downtown E-W LRT Updates & Downtown Moves Study
a. Tunnel Re-alignment along Queen Street
- The re-alignment will result in shallower stations, more flexible construction options aimed at making it easier to stay within budget
- The RFP to be issued to 3 companies/consortiums
b. Kick-off of Downtown Moves Consultation process
- Downtown street renewal intiative due to LRT project
- Jordan to be CCC representative for this consultation process
- John is Action Sandy Hill representative
6. Ottawa River East End Bridge Phase 2B
a. Results from public consultations meetings: Meetings were held in June in the communities where the proposed bridge might be located
-the lead project manager has changed
-east end communities are now arguing that an east end bridge seems unlikely to provide a definitive resolution to the downtown truck traffic issue
-the lack of feedback from truckers was discussed
b. PCG report September 14, 2011
c. Review of stated position of elected representatives
7. Update on LRT W Corridor Selection
-evaluation of the 15 route option combinations continues
-meeting where evaluation results and preferred corridor to be presented
-discussed the NCC’s letter from the summer about the parkway not being an option at this time
8. Road Re-development Projects Update
a. Rideau Street (Sussex to Rideau River): next meeting to be in a few weeks; the street lights will be interesting
b. Scott Street
9. Interprovincial Transit Study
- Study report more than 6 months overdue
- Apparently report to be made available before the end of 2011
10. Report on Sustainable Transportation Breakfast Seminar (John)
11. Any other business
a. Traffic Impact Study (Roland)
- Developers must provide traffic impact studies to the City when they are applying for approvals
- The developers hire the consultants who conduct the studies
- The developers pay the consultants for this service
- Almost never does the project require any developer costs to improve the local transportation network
- This does lead to an appearance of conflict which can erode public confidence in the process
- Is there a way that this process can be changed to avoid the appearance of conflict? Is there a role for the CCC in such a reform effort?
ACTION: Jordan to ask Diane about this to get some informal feedback
John to send Roland a link to City document about traffic studies
Roland to lookup traffic impact study for a project near Westboro Station
OBJECTIVE: Get comments from community associations, work towards a meeting with relevant City staff person(s) to discuss issue, suggest ways to avoid appearance of impartiality,
b. George reported that Cam appreciates the well wishes received
c. Island Park Drive
- Was scheduled for re-paving but this has been delayed
- Gives an opportunity to implement simple redesigns including a traffic signal at Island Park/Iona, Island Park/Carling intersection improvement, redesign of Island Park/Parkway intersection to create a break in the flow of traffic
d. Gladstone O-train Station
- There will be a passing track built near Gladstone
- Has the Centretown Citizens CA has written a letter in support of this initiative?
- CCC would be able to write a letter in support of this suggestion
e. Lansdowne Live
-George attended the last Lansdowne presentation; says there will be an appeal of Superior Court decision
Next Meeting: October 26, 2011