MMDRA BEML DMRC Visit for FAT for Mumbai Metro L2/L7 Maintenance Simulators

CC Engineers is set to deliver Maintenance Simulators for the Mumbai Metro Line 2 and Line 7 project. The project is headed by MMRDA procuring rolling stock from BEML. DMRC has been playing a key role in this project for consulting and providing expert insights into the entire project. The Maintenance simulators include separate maintenance simulators for 12 sub-systems including TCMS, Vehicle Control, Brakes, Auxiliaries, Traction motors, and others.