CE471 – Advanced Steel Design - Mini Bridge Construction ProjectGroup 3 :This Mini Steel Bridge project serves as an example of how to combine structural efficiency, advanced steel design approaches, and useful problem-solving abilities. With careful design, accurate construction, and thorough testing, we were able to build a bridge that could support heavy loads while staying within safety and dimensional requirements. Despite the challenges faced—such as measurement errors, design complexities, and initial failures — we overcame these obstacles. This project is the true reflection of engineering in action because it allows to practice in real life applications.#ParagonIU #CEDepartment #FutureEngineers #CivilEngineering