Resources
Execution Strategy for LLC and IT Suite Design and Delivery
To achieve success while building the Library Learning Centre , classrooms and IT Suite at High Storrs School, a detailed execution strategy is required. Our methodology is precise, systematic, and dedicated to providing quality at every level of the project.
Pre-Construction Phase
Conduct thorough site surveys and evaluations to guide design and construction decisions.
Create design concepts and needs based on feedback from stakeholders and educational technology professionals.
Determine any possible concerns with material selection, availability, cost, and quality.
Planning and Procurement
Determine required construction machinery, equipment, and materials.
Purchase plant machinery such as excavators, grab waggons, and mobile cranes.
Use products from trustworthy sources, emphasising durability and cost-effectiveness.
Create a thorough plan for machinery deployment, scheduling, and logistics.
Coordinate the transfer and storage of machines and goods on site.
Labour Management
Assess labour requirements and hire skilled individuals such as craftspeople and IT experts.
Offer thorough training programmes for construction workers, with a focus on safety and technology installation.
Implement excellent people management strategies to increase productivity and track performance.
Technology Infrastructure Installation
Work with IT specialists to establish network infrastructure and technical equipment.
Ensure the smooth integration of technological solutions to support current teaching and learning approaches.
Construction Phase
Mobilise plant machinery and labour in accordance with the project timetable.
Begin site preparation and verify compliance with building codes and safety laws.
Interior Finishings and Furnishings
Install interior finishes and ergonomic furniture to improve function and appearance.
Testing & Commissioning
Conduct extensive testing on building systems and get all relevant occupancy certificates.
Hand-over and Transition
Complete paperwork and provide training seminars for school staff.
Officially pass over the completed LLC and IT Suite to school administrators.