Schedule Suggestion

If you have never performed the LCT pipeline all the way through, here is a suggested schedule with days, times, and steps (assuming active labeling with SmartLabel or SmartBatch+). This schedule prevents work after 5PM and on weekends. The schedule has places where it is flexible, as demonstrated in the timeline graphics on each immonolabeling page.