Overview of Status of Analysis, Design, Fabrication, Tests, etc.
almost finished control/interface system of pump
ready to start designing conveyor system
Accomplishments from Previous Week
almost finished control/interface system of pump
finished funnel prototyping
placed order for stepper motor for conveyor system
Goals for Next Week (list names after each item). Use specific and measurable objectives.
finish control and interface system for pump and test them using oil (Genggeng Zhou)
start design conveyor system (Bowen Li)
manufacture one holder (Zhanqing Huang)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
sponsor is satisfied with the interface system we designed/ Jan 27 in person
sponsor agreed to move loading and unloading area to a reach goal/move to next quarter/ Jan 27 in person
sponsor can provide help with manufacturing if needed/ Jan 27 in person
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
we need to determine our responsibility with the sponsor; we contact our sponsor through email and talk to them during meeting. they agreed to move them to next quarter.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/a
Risks and Areas of Concern
Nothing we can think of right now
Resources or Information Required but not Available
Nothing we can think of right now
Schedule
finish and test pump with fluid by next week
perform risk reduction to solidify design for conveyor system by next week
finish manufacturing one holder by next week
Update Gantt chart.
Budget (list amount spent and amount remaining)
435.15 spent; 9564.85 remaining
Progress on Report and Webpage
finished required section from last week