The following parts and quantities are required for the Final Design:
(1) 2.4" - 3.5" Diffuser (FinalDiffuserWelded)
The following parts and quantities are required for the Runner Up Design:
(1) Chevron8
(4) Lobes
(1) Main Flow Duct
(1) 3.5" - 4.5" Diffuser (DiffuserWelded)
(2) SS Hose Clamp 2.5" Diameter
Assembly of Runner Up Design:
Weld Lobes into the Main Flow Duct
Weld Chevron8 onto outlet of Main Flow Duct
Use hose clamps (alternatively, weld) to attach Assembled Main Flow Duct to the Turbine outlet
Position 3.5" diameter end of Diffuser just before outer opening of the lobes (1" upstream). Diffuser should be concentric with the Main Flow Duct
Please reference Final Assembly below.