Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Design completed, testing (water testing) completed.
Ready to be delivered to sponsors.
Accomplishments from Previous Week
Completed water testing with the sponsors on their boat. Did two trials with the sled. A diver was hired to go and observe how the sled behaved under water.
The diver confirmed that the sled did bury itself to the necessary depths.
The team and sponsors could not deploy the fabric accurately because the electronics package was lost during the drop of the sled into the water. As a result, the fabric was left alone to see if pulling the sled would be sufficient in deploying the fabric.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Grind off welds for aesthetic purposes. (Mark)
Present at SPAWAR on Wed. (Everyone)
Deliver sled.
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsors will need to devise a way to attach the wires to a new electronics package for accurate deployment. The team may not be able to assist with this because we do not have the electronics package, and are strained for time to build a new one.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
None
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
None
Risks and Areas of Concern
None
Resources or Information Required but not Available
None
Schedule
Present at SPAWAR on Wed.
Finish Report by Friday
Finish website by Friday
Budget (list amount spent and amount remaining)
Total Spent: $795.18
Total Remaining: $104.82
Progress on Report and Webpage
Revisions and feedback on report received and going through comments and making final changes to report and adding test results.
Adding testing pictures to multimedia section, finalizing all sections.