Bike Path has been again separated into two parts, so we're back to original timetable. That means I'm back to trying to work through all the bureaucratic hoops associated with right of way (having lost 2 - 3 months during this delay). In theory, we are aiming to have all of that pinned down by October.
See MassDOT Letters below