Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Scale model was modeled in SolidWorks
Materials have been received for scale model of swing (except weights)
MATLAB code has been to understand dynamics of swinging
Accomplishments from Previous Week
Added standing swinging scenario to MATLAB code
Researched different types of rope
Scale model designed in SolidWorks
Ordered materials for swing
Research into seat materials/possible light under seat
Went to playground at a park and observed and tested real world swings
Budget template created
Machine shop form signed off
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Add drag and other resistive forces into MATLAB analysis (Alex)
Build scale model (Nina and Gwen)
Test scale model (all)
Meet in Structures Lab (all; Nina coordinating with Mathieu)
Make free body showing forces on swing (Alex and Nina)
Update budget (Engleap)
Individual component analysis:
Alex: Matlab things
Gwen: Seat analysis
Engleap: Rope material/drag
Nina: Fabric analysis
Adam: Safety
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Would like to see fabric as a source of drag analyzed (3/11)
Wants to make sure we looking sheathing for rope (if a more rigid material is chosen) (3/11)
Wants to start on full model very early next quarter
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Wants list of all possible failure modes/user error
Would like a list of what we will be testing in the scale model and what we would like to learn
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Simulation accuracy
Time constraints for scale model testing
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Scale model testing
Individual component analysis
Update Gantt chart.
Budget (list amount spent and amount remaining)
Total spent: $138.10
Total Available: $2600
Present Balance: $2,461.90
Progress on Report and Webpage