Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Currently beginning fabrication of enclosure and adapter(s)
Continuing some modified configuration tests to determine some preliminary design aspects
Adding components to dampen vibrations, reducing heater distance/changing orientation, etc.
Accomplishments from Previous Week
Configuration testing resulted in temperature variation of <1 degree Celsius
Proof of concept validated
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Progress on fabricated parts
Consensus on key design features from testing
Agree to a presentable preliminary design
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Take care to reduce vibrations caused by the fan heaters as it will affect image quality
Conducting an in-lab imaging test on Wednesday meeting with sponsor
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Elaborate on the background of the project
Explain testing configurations and the progression into other configurations
Think about using hollow thread rods for aspects that are difficult to machine
Use a comparison table to summarize test findings
General action(s) for comments: Will be taken into consideration if applicable in next presentation
Will see if hollow thread rods can be substituted into design
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Could a circulation method be incorporated?
Try pressfitting the circular components
Improve legibility of powerpoint
Elaborate on background of experiments
Adding a video may help in explanation
It may be good to consult an engineer for the PID control later on
Explain the general design of the project more
Risks and Areas of Concern
Vibrations caused be the fan heaters
Stabilization of PID controller with changing configurations
Resources or Information Required but not Available
How to replicate/deal with issue of sample holders
Schedule
Finalize preliminary design specifications
Fabricate enclosure and adapter(s)
Check for/order any remaining parts that are missing
Budget (list amount spent and amount remaining)
Amount Spent:
To date: ~$600
Amount Remaining:
Highest Possible (assuming $5000 reserve): $4400
Lowest Possible (assuming $3000 reserve): $2400
Progress on Report and Webpage
Working on Second Draft of Report (Due Friday 5/18/18)
Working on Second Draft of Team Webpage (Due Friday 5/18/18)