Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Analysis issues persist. Extra steps to work on fixing issues and reaching out to others are being taken.
Drawing with dimensions/angles of parts in process of production.
Knowledge of epoxy being used during assembly in process of being acquired
Accomplishments from Previous Week
Completed project management and time allocation for tasks to accomplish before end of quarter (Angelica, Sean, & Sam)
Compiled full list of interaction points on the bike / attachment schemes and coordinate with bike mechanic Jared for compatibility with his parts (Ved & Nicolas)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete FEA. (Sam, Sean, & Angelica)
Drawings of all tubes in assembly, including angle, radius,and length for both ends. (Sam & Nicolas)
Obtain titanium stock available from Bill Holland. (Ved & Nicolas)
Set up milling specifics tutorial with Bill Holland. (Sean & Sam)
Learn how to apply adhesive to interface between carbon and titanium. (Ved)
Begin milling titanium stock for welding. (Sean, Ved & Angelica)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Compile a list of contact points between individuals within the trike team so that if problems arise, Jose knows who to talk to or how to resolve the issue. (2/9/17 in person)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Modeling assembly as structure may help with modeling as a beam. (2/9/17 in person) Modeling as a beam did not stop analysis from failing.
Consider use of beam elements as most relevant representation of model (2/9/17 in person) Modeling as a beam did not stop analysis from failing.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Solidworks analysis failure. May need to redesign parts to run accurate analysis or model simpler elements/geometry to get a working analysis.
Resources or Information Required but not Available
Solutions to mesh control failure uncertain.
Schedule
Budget (list amount spent and amount remaining)
Spent: $0.00
Remaining: $ 9995.70
Progress on Report and Webpage
Week 6 progress report complete.
First draft of report completed and uploaded to website.