Overview of Status of Analysis, Design, Fabrication, Tests, etc.
All CAD Created/"Finalized"
All parts now bought!
Subassemblies:
Feeder/Conveyor: Mid Fabrication (waiting on 80/20)
Product Dispenser: FULLY OPERATIONAL
Insert Dispenser: Redesigned, functional motorized prototype fabricated, tweaking design for optimal performance
Folder: Fabrication finished, waiting on Motors to motorize (prepping 3d printed and acrylic mounts in the interim)
Sealer: Circuit works, housing design finished, parts ordered, waiting for their arrival (prepping acrylic parts in the interim)
Control System: Drives motors, logic planned out, implementation has begun!
Accomplishments from Previous Week
Finished fabrication on folding mechanism, minus motors (arriving soon)
Finished motorization of Product Dispenser
Built controls flowchart for our driver logic
Successfully drove stepper motors at the appropriate voltage using our arduino, power supply, and borrowed Motor Driver Board
Bought final set of parts!
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Be ready for the Preliminary Design Presentation!
Finish powerpoint- ALL
Motorize Folding Mechanism- Griffin
Fabricate Sealer Housing- Griffin and Ali
Motorize Sealer Housing- Griffin and Jerry
Fabricate Conveyor Belt/Feeder- Dai
Motorize Conveyor Belt/Feeder- Dai and Jerry
Optimize Insert Dispenser- Ali and Jerry
Control System Interfacing- Jerry
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Very satisfied with all the progress we've made (took tons of pictures) (5/12)
Had a motor driver board he recommended we use (5/12)
Excited to see the final thing! (5/12)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Website looks very good (thanks :D ) (5/9)
Time is less than we think it is (5/9)
Should put more focus onto controls than we were (5/9)
Bet a power supply that can give us all the power we need! (5/9)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
All of the feedback from our presentations that Young has recently sent out (5/11)
Risks and Areas of Concern
Finishing on time (Less afraid now than last week though!)
Resources or Information Required but not Available
N/A
Schedule
Primary Design Review Presentation: 5/23
Report 2nd Draft (and Website Draft 2): 5/26
Update Gantt chart as needed.
Budget (list amount spent and amount remaining)
Spent this week: $192.87
Impulse Sealer Parts: $214.82
80/20 Frame Parts: $182.92
McMaster Parts (Bearings, Rubber, etc): $31.90
Geared Motors for Jaws: $40.13
Stepper Motors for Everything Else: $85.15
RAMPS 1.4 Driver Boards: $66.77
Spent Total: $
$45.43 Remaining
3.79% of Budget Remaining
Progress on Report and Webpage
Being worked on, modified, cleaned up, new CAD being added when spare time is available