Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Risk Reduction has been completed
Moving forward with the Single Sheet method
(Initial) Individual Component Analysis is now being tackled
Accomplishments from Previous Week
No hard calculations were accomplished over Spring Break, as all of the group members needed a break from the rigors of Finals. That being said, some concept generation and design choices were perused and considered over the break.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Individual Component Analysis (tasks have been redistributed since Risk Reduction Presentation)
Impulse Heater Sealing- Jerry Ng
Hydraulic Plastic-Folding Arm- Griffin Brunner
Plastic Feeding Apparatus- Dai Huynh
Loadable Magazine of Inserts and Product- Ali Ismail
*EXTRA* Controller- Jerry Ng (if he happens to have extra time)
Group Brainstorm the following steps:
How to get the product from the magazine into the appropriate place on the plastic sheet
How to cut the plastic reliably
How to prevent the Impulse Heaters from gumming up
Update Website's internal pages- Griffin Brunner
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
N/A
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
N/A
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
N/A
Resources or Information Required but not Available
Where can we find an LDPE roll of the Appropriate size for our design?
Response: Can get roll resized readily in the area by a local plastic converter, should consult and see if fees are too high
Are we undertaking too much for our individual component analysis? Too little?
Response: Only have 2 pages, so be smart and cover as in depth as we can with the little space that we have
Schedule
Meeting with Sponsor on 4/7
Individual Component Analysis done by Midnight on 4/7
Website internal pages set up by Midnight on 4/7
Meetup on 4/9 to plan for Design Proposal Presentation
Need to Update Gantt chart
Budget (list amount spent and amount remaining)
Full budget currently remaining.
Progress on Report and Webpage