Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Each team member pitched ideas for a ramp design and blade modification design
Noticed that many of our designs were similar for the ramp
Designs for the blade were focused on adding on a separate attachment rather than designing an entirely new blade
Leaning toward an attachment that would support the tube against the blade that would rotate to release into the trachea
Accomplishments from Previous Week
Now have a clearer understanding of project challenge and desired product
Each team member pitched ideas for a ramp design and blade modification design
Noticed that many of our designs were similar for the ramp
Designs for the blade were focused on adding on a separate attachment rather than designing an entirely new blade
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Decide on a finalized design for intubation ramp - Everyone
Make CAD models of ramp - Brian
Decide what materials would work best for ramp - Everyone
Based on this, decide if it should be disposable or non-disposable
If non-disposable, what kind of covers/protection would be used?
If disposable, the type of materials would be important
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Second meeting with Sponsor (Week 10):
Pitched some of our stronger designs to the sponsors for both ramp and laryngoscope/tube modifications
Received critiques and additional things to consider when making improvements
Gave us deeper understanding of the specifics of the entire process
Detailed and useful information when designing parts, to cater to doctors’ needs
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
NA
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
NA
Risks and Areas of Concern
Risk Reduction Discussion
Discussed non-disposable vs disposable instruments (for both ramp and laryngoscope), and the practicality and pros/cons of both sides
Decided what to focus on for Risk Reduction analysis
focusing on design of ramp
Outlined process needed for risk reduction analysis
Need figures, CAD models, multiple designs for comparison
Resources or Information Required but not Available
NA
Schedule
Prepare Risk Reduction Presentation for Final
No Gantt Chart currently
Budget (list amount spent and amount remaining)
Spent: $0
Amount Remaining: $1500
Progress on Report and Webpage
Webpage continually updated