Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Bought 10 sets of electronics
Finished soldering 8 sets of circuit onto the perf board
Tested two 12-V (7Ah) batteries in series and parallelÂ
Have working Arduino code; currently working on transferring it to MATLAB to create the GUI
Accomplishments from Previous Week
Finalized design of LED circuit and tested on breadboard
In process of soldering circuit onto perf board
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Finish PCB design on Eagle by next Wednesday (Nick)
Look into Heat Sinks (Noor)
Test battery and circuit details and components (Simon & Nick)
Work on AutoCADing the entire casing of the system (Jen)
Finalize delta pads and temperature control (Jen)
Get Matlab code working (Noor & Simon)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
We talked about issues in the coding and she clarified some issues with understanding how to simulate the frequencies (4/22 in person)
We have updated the code to get it working in Arduino and now are working on implementing it in Matlab
Showed her our initial battery tests proving our theoretical analysis that the battery will last for the experiment time (4/24 via email)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Measure the current through all the components and calculate the current to see if the battery will last (4/23/14, in person)
See if most of the power dissipation is through the transistor or the LEDs (4/23/14, in person)
Look into whether or not there will be a PCB fatigue problem with different materials on the LEDs and PCB (4/23/14, in person)
Thermal expansion mis-match with PCB, LEDs, and heat sink (4/23/14, in person)
Sarcon and Fuji Putty, compliant (4/23/14, in person)
Small fan above PCB, made by Sunon (4/23/14, in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
NA
Risks and Areas of Concern
Need to finalize temperature control design and start building
Need to finalize heatsink design and start building
PCB design
Resources or Information Required but not Available
NA
Schedule
Finalize PCB design
Get Matlab code to work
Update Gantt chart.
Budget (list amount spent and amount remaining)
$231.48 spent, $2768.52 remaining
Progress on Report and Webpage
Finished Week 5 Progress Report
Working on completing the first draft of the report by Friday