Post date: May 20, 2014 12:41:29 AM
An overview of the project and team's objectives. (Simon)
A description of the final design and how it meets the project objectives (Simon)
A description of each component of the design
LEDs (Simon)
Arduino (Nick)
Batteries (Nick)
Heat Sink and Fan (Noor)
Deltaphase Isothermal Pad (Jen)
Circuit diagram (Nick)
PCBs (Nick) schematic and board layout
Casing (Jen)
LED covers (Simon)
Code (Noor)
A plan for completing the design by the Final Design Review (week 9) (Noor)
A detailed to-do list of all aspects required in completion of the project. Show:
High Priority to-do items that must be completed. Each such item should have a due date no later than week 9, and individuals responsible.
LED covers (Simon responsible, by end of this week), Acrylic Casing (Jen responsible, by end of next week b/c need to test with all components)
Second priority to-do items, that will be completed time permitting.
GUI (Noor responsible, by week 9)
A Gantt chart with task assignment for the rest of the quarter (Jen)
A plan for testing the design (Jen)
Run the whole system for an hour
Measure temperature of delta pad
Measure battery voltage throughout and voltage across resistors?
Heat sink heat dissipation measure heat with thermal camera
List any concerns that need to be resolved (Noor)
How well the heat sink will dissipate heat
Working PCBs