Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Met with Jules and decided on which design to focus on and decided on a reduction ratio to recommend for the Flat Geared Motor. All testing for analysis completed.
Accomplishments from Previous Week
Draft Poster completed
CAD of motor plates and battery plates for both LG & FG
Machined motor plates and battery plates
Aluminum hydrophone plate testing & analysis - might not fit underneath controller board :(
SW model complete with 4 configurations (original, FG, LG, sandwich mounts)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Final Report (Hannah, team)
SW Drawings (Myles, Hannah, Devin)
Recent test data analysis (Myles)
Final Website (Ilija, Hannah, team)
User Manual (Hurby, Ilija)
Complete any last minute machining (Myles)
Final Assembly (Devin, Hurby)
Final Poster (Everyone)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
From meeting with Jules & Rob (5/31):
For noise recording, usually measure intensity, not amplitude
If hydrophone is not saturated, can filter motor noise out
For PID (currently unknown): how fast do you the piston to move? Want it to go as slow as possible to reduce noise
"Final Design" is Flat Geared motor, but recommend a better gear ratio for internal gearbox
Overall: quieter is better
Can't be totally final design, because dependent on PID control
Find max load FG can take; equate to depth of FG design. Then find smallest gear ratio that still has enough torque--this will increase piston speed
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
For 2 solutions, give recommendation with pros/cons list. Final design will be the recommended one, and the other design will be explained in detail in Appendix
Should contact Jules on what design he prefers
Email Dr. T Paul's email address; Paul might help Jules complete evaluations
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Got many helpful comments regarding our report and website from Team 12
Risks and Areas of Concern
N/A
Resources or Information Required but not Available
N/A
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Spent $1170.13
Remaining: $1829.87
Progress on Report and Webpage
Webpage and report edits from Team 12 completed. This week will do finishing touches.