Tropo station planning

Post date: Nov 15, 2008 10:16:40 PM

Preparations are well underway for the tropo station at V51. A master plan is mostly complete. The equipment list needs to be finalized, and operating frequencies still need to be determined. Time and frequency schedules will be made so as to coexist with the 2m EME station at the same site.