Key Challenges
Key challenges faced
- Obtaining reliable information about past projects related to high velocity stream crossings
- Obtaining concrete and other similar materials if a design method involving these materials is chosen
- Obtaining information on design and cost of articulated concrete blocks from a manufacturer
- Obtaining reliable topographic and survey data for the site
- Developing a stream crossing design that is economic for the landowner
- Being able to test our new proposed methods
- Ensuring the stream crossing will not erode under high flows
- Creating a surface that is safe for cattle and equipment to cross
- Following standards laid out by VA NRCS when creating a crossing
- Creating an accurate economic analysis based off the cost information received
- Calculating erodibility of rock crossing at new proposed site for 50 year design life
- Keying in the ACB crossing into existing grade at entrance and exit approaches