Key challenges faced

  • Obtaining reliable information about past projects related to high velocity stream crossings
  • Obtaining concrete and other similar materials if a design method involving these materials is chosen
  • Obtaining information on design and cost of articulated concrete blocks from a manufacturer
  • Obtaining reliable topographic and survey data for the site
  • Developing a stream crossing design that is economic for the landowner
  • Being able to test our new proposed methods
  • Ensuring the stream crossing will not erode under high flows
  • Creating a surface that is safe for cattle and equipment to cross
  • Following standards laid out by VA NRCS when creating a crossing
  • Creating an accurate economic analysis based off the cost information received
  • Calculating erodibility of rock crossing at new proposed site for 50 year design life
  • Keying in the ACB crossing into existing grade at entrance and exit approaches