Constraints & Criteria

Criteria:

    • Rock or other material used will not wash away during high flows
        • A rock large enough to resist blow out in high velocity streams is necessary
        • Material anchored strongly enough to resist blow out in high velocity streams
    • The updated design note must comply with all criteria in VA CPS 578
        • The "USDA - NRCS Conservation Practice Standard 578: Stream Crossing" is the standard for cattle stream crossings in Virginia and includes general criteria such as location of crossing along the stream reach, which must still be followed
    • Designing a crossing that will safely allow cattle and equipment to access fields south of Catawba Creek

Constraints:

    • Obtaining material other than rock and geotextile for design testing
    • Availability of required surveying equipment
    • Coordinating with the Catawba Sustainability Center Manager to find suitable times to survey the site
    • Designing a low cost crossing for the Catawba Sustainability Center
    • Creating a sustainable crossing that requires little maintenance
    • Find a proposed crossing location that will require little grading and clearing of vegetation