SR5: act 1
16 June 2025
16 June 2025
Station details:
Code: SR5
Line Served: Southern Line
Operator: MTR Corporation
Address: 1 Media Ring, Singapore 023871
Structure: Underground
Platform: Island
Opening: 16 Jun 2025
act 1 MRT station is located within the Singapore Acting Centre. This station brings connections for people to the Singapore Acting Centre and surrounding residential estates from other parts of the country.
It is also located a few metres away from Red Village, which is within walking distance of the station.
A temporary depot built at act 2, which is also named act 2 Depot, is built a few metres ahead the station through overrun tunnels.
It is the first station integrated with a building structure.
A bus stop will be constructed outside the station so that a new "feeder" service can be introduced to connect it to Red Village.
Station Layout:
L1: Concourse
Faregates, Ticketing Machine, Customer Service Centre
Singapore Acting Centre
Street Level
Exit, Bus stop
B2: Platform
A: Train service towards Zazaa via Siah
B: Train service towards Nibong Island via Trinidy
Exit(s):
A Singapore Acting Centre/Red Village ♿️