For several years we have been experiencing a severe electro-energetic crisis that is affecting the lives of all the inhabitants of the island. In 2024 I had the opportunity to visit the extremes of Cuba due to work for a documentary. Each night I was able to observe how the landscape was influenced by the capacity of electro-energetic generation in the location. Along with each photograph, the location, time and amount of time without electricity are noted.
Punta de Maisí (Guantánamo)
21:47 AM; 24/04/25
3 h sin fluido eléctrico.
Poblado Las Martinas (Pinar del Río)
05:22 AM; 06/05/25,
22 h sin fluido eléctrico.
Poblado Las Cuevas (Santiago de Cuba)
9:25 PM; 27/04/25,
Intervalos de 30 min, sin generación eléctrica, por recarga Hidroeléctrica.
Poblado Las Cuevas (Santiago de Cuba)
9:24 PM; 27/04/25
Intervalos de 30 min, sin generación eléctrica, por recarga Hidroeléctrica.
Poblado Las Cuevas (Santiago de Cuba)
9:38 PM; 27/04/25,
Intervalos de 30 min, sin generación eléctrica, por recarga Hidroeléctrica.
Poblado Las Cuevas (Santiago de Cuba)
9:32 PM; 27/04/25,
Intervalos de 30 min, sin generación eléctrica, por recarga Hidroeléctrica.
Poblado Las Martinas (Pinar del Río)
05:13 AM; 06/05/25,
22 h sin fluido eléctrico.
Poblado Las Cuevas (Santiago de Cuba)
9:40 PM; 27/04/25,
Intervalos de 30 min, sin generación eléctrica, por recarga Hidroeléctrica.