December Results

Current Progress Update

The group has made significant progress through the course of the first project semester. Team member efforts have culminated in the generation of the wetland conceptual design found in Figure 10, as well as a full set of hydrologic calculations. This design is the product of the completion of all designated milestones (listed on the "Project Design Milestones" page). The most critical of these milestones was the completion of the hydrological analysis of the site and the GIS work. Without having the GIS analysis completed, the group was unable to begin any other part of the design process. However, once this was done the group was able to fully begin the process of sizing the wetland. The determination of the wetland's size was done using the results of our hydrological analysis, which is why this step was so critical to the overall design process.